Queen COFFEE QUEEN Manuel d'utilisateur Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 22
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
8. Operating instructions. (Brewing coffee) Tower for wall-mounting.
8.6. Start brewing .
1. Push button 1/1 for 5 litre.
Display shows:
When Brewing is ready.
The ”Brewing” indicator
lamp will lit.
2. STOP / PAUSE button
- Press button once for stand by.
- Press button twice to stop brewing.
To complete brewing, press ½ alt. 1/1.
TAPING HOT WATER It is possible to take
hot water while brewing coffee.
NOTE!
On the brewer unit, a water tap is placed for
serving hot water.
You can as a maximum taping 2 pitchers (1.8litre)
of hot water, while brewing coffee.
12.
Vue de la page 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 21 22

Commentaires sur ces manuels

Pas de commentaire